Latest articles

Ballard to supply 500 fuel cell engines for New Flyer buses from 2026

Ballard Power Systems announces it has signed an agreement with New Flyer for 500 fuel cell bus engines totaling 50 MW, with deliveries starting in 2026. Ballard Power Systems and New Flyer, part of NFI Group, announced a commercial agreement for the supply of 500 FCmove-HD+ fuel cell engines for in...

Ballard has a new CEO: it’s former Verdagy’s head Marty Neese

Marty Neese has taken over as President and CEO of Ballard Power Systems effective July 7th 2025. He joins Ballard from electrolysis system manufacturer, Verdagy, “with an extensive background in operations, and wide-ranging experience in product standardization, product cost reduction, volume produ...

Highlights

The HVAC behind London’s electric double-deckers

Every day, over 950 zero-emission double-deckers travel through the streets of London. The air conditioning systems powering them are built by SONGZ. These vehicles meet Transport for London (TfL) standards 2.2 and 2.5 — among the most demanding public transit approval requirements in the world. SO...

ballard power systems

Ballard to supply 500 fuel cell engines for New Flyer buses from 2026

Ballard Power Systems announces it has signed an agreement with New Flyer for 500 fuel cell bus engines totaling 50 MW, with deliveries starting in 2026. Ballard Power Systems and New Flyer, part of NFI Group, announced a commercial agreement for the supply of 500 FCmove-HD+ fuel cell engines for in...

Ballard has a new CEO: it’s former Verdagy’s head Marty Neese

Marty Neese has taken over as President and CEO of Ballard Power Systems effective July 7th 2025. He joins Ballard from electrolysis system manufacturer, Verdagy, “with an extensive background in operations, and wide-ranging experience in product standardization, product cost reduction, volume produ...
  1. 1
  2. 2
  3. Next